{"id":2908,"date":"2026-06-06T08:55:12","date_gmt":"2026-06-06T08:55:12","guid":{"rendered":"https:\/\/enterclimate.com\/blog\/?p=2908"},"modified":"2026-06-06T08:55:14","modified_gmt":"2026-06-06T08:55:14","slug":"maharashtra-renewable-energy-policy-2025-26-to-2035-36","status":"publish","type":"post","link":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/","title":{"rendered":"Maharashtra\u2019s\u00a0Renewable Energy &amp; Energy Storage Policy\u00a02025-26\u00a0to\u00a02035-36\u00a0"},"content":{"rendered":"\n<p>The state of Maharashtra is undergoing industrial growth and urbanization. It results in high electricity demand across the industrial, commercial, and residential sectors. Earlier, this electricity demand was fulfilled by conventional sources of energy until an official notification was released on March 18, 2026.&nbsp;<\/p>\n\n\n\n<p>The Maharashtra Government released an official notification, \u201cMaharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36\u201d. It is a<strong>&nbsp;<\/strong>10-year framework, valid until 31 March 2036, encouraging the adoption of renewable energy and energy storage infrastructure.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Maharashtra Renewable Energy and Storage Policy&nbsp;focuses&nbsp;on renewable energy generation, grid stability, better energy storage systems, customer access to green energy, and supports a zero-carbon economy. The goal of this policy is to bring opportunities for renewable energy developers, MSMEs, investors, DISCOMs, industries, and consumers to contribute to the transition under Maharashtra\u2019s Renewable Energy and Energy Storage Policy.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Read more &#8211; <a href=\"https:\/\/enterclimate.com\/blog\/popular-renewable-energy-sources-available-in-rural-india\/\">Popular Renewable energy sources available in Rural India<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why\u00a0did\u00a0Maharashtra\u00a0introduce\u00a0the\u00a0MRE Policy?\u00a0<\/h2>\n\n\n\n<p>The Maharashtra government has introduced the MRE policy for&nbsp;various reasons, which are listed below. The policy is designed to fulfil the increasing electricity demand. Also, it adopts renewable energy to mitigate high carbon emissions for economic growth with clean energy. The MRE policy was introduced to address:&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Increasing electricity demand in Maharashtra through renewable energy. \u202f\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>It requires grid stability and reduces dependency on fossil fuels.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Promote the Battery Energy Storage System (BESS) and Pumped Storage Projects (PSPs) to support Maharashtra state in green energy.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The future electricity demand will be met through renewable energy sources.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Encourage consumer participation by\u00a0procuring\u00a0renewable energy.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Renewable energy is a cost-effective, long-term, and sustainable source of electricity.\u00a0<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Maharashtra Renewable Energy Targets Under the Policy\u00a0<\/h2>\n\n\n\n<p>The MRE policy has major targets for renewable energy&nbsp;procurement&nbsp;and energy storage deployment.&nbsp;&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Renewable Energy Targets:\u00a0\u00a0<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Procure 65% of the electricity\u2019s total demand from renewable energy by FY2035-36.\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Achieve 50% share of renewable energy for the\u00a0rising electricity demand\u00a0in\u00a0FY2029-30.\u00a0<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Energy Storage Target:\u00a0<\/h3>\n\n\n\n<p>To achieve&nbsp;renewable&nbsp;energy&nbsp;targets,&nbsp;Maharashtra&nbsp;estimates\/requires&nbsp;100 GWh per day of energy storage capacity by&nbsp;FY2035-36. It promotes&nbsp;energy security and grid stability.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Read more &#8211; <a href=\"https:\/\/enterclimate.com\/blog\/popular-renewable-energy-projects-in-india\/\">Popular Renewable Energy Projects in India<\/a><\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Renewable Energy and Storage Targets\u00a0<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Maharashtra RE policy\u00a0supports renewable energy projects integrated with\u00a0energy storage systems.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Secure\u00a0at least 10 GW by FY2029-30 and at least 25 GW by FY2035-36,\u00a0required\u00a0for\u00a0solar, wind, and wind-solar projects\u00a0with co-located storage.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Thermal Bundling Targets\u00a0<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The MRE policy promotes bundling of thermal power stations integrated with renewable energy and\/or energy storage systems.\u00a0\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The thermal bundling targets are 2 GW by FY2029-30 and 5 GW by FY2035-36. This approach\u00a0supports better infrastructure while integrating renewable energy into grid connectivity.\u00a0<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Energy Storage Obligation (ESO)\u00a0<\/h3>\n\n\n\n<p>The energy storage facility supports Maharashtra\u2019s RE policy\u2019s major&nbsp;objective&nbsp;of transitioning towards renewable energy. It is&nbsp;because&nbsp;solar and wind energy, which are&nbsp;renewable&nbsp;sources,&nbsp;rely on weather conditions.&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>As a result of this, deploying energy storage systems&nbsp;facilitates&nbsp;the&nbsp;generation of renewable energy in excess. This&nbsp;helps in&nbsp;supplying&nbsp;power when renewable energy output is declining.&nbsp;Regarding&nbsp;this, Maharashtra state seeks to develop 100 GWh per day of energy storage by FY2035-36.&nbsp;&nbsp;<\/p>\n\n\n\n<p>The MRE policy requires the Distribution Companies (DISCOMs)&nbsp;to&nbsp;procure&nbsp;energy storage capacity. It must be&nbsp;10%&nbsp;equivalent to the total electricity demand by FY2035-36. To secure this target, at least 85% of the total energy stored annually must be sourced from renewable energy.&nbsp;<\/p>\n\n\n\n<p><strong>Read more &#8211; <a href=\"https:\/\/enterclimate.com\/blog\/how-to-start-a-renewable-energy-business-in-india\/\">How to start a Renewable Energy business in India?<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who will Benefit from the Maharashtra Renewable Energy Policy?\u00a0<\/h2>\n\n\n\n<p>The list of entities&nbsp;benefiting&nbsp;from the Maharashtra Renewable Energy Policy is given below:&nbsp;<\/p>\n\n\n\n<p><strong>Commercial and Industrial (C&amp;I) Establishments:<\/strong>&nbsp;<\/p>\n\n\n\n<p>C&amp;I&nbsp;leverages&nbsp;the procurement of renewable energy for captive renewable energy projects, long-term energy planning, and Open Access arrangements.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Distribution Companies (DISCOMs):<\/strong>&nbsp;<\/p>\n\n\n\n<p>DISCOMs contribute to fulfilling the policy\u2019s RE storage targets. They must&nbsp;procure&nbsp;the energy storage capacity equivalent to at least 10% of the total electricity demand by 2035-36. To fulfil this goal, at least 85% of the total energy stored must be derived from the sources of renewable energy.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Renewable Energy Developers:<\/strong>&nbsp;<\/p>\n\n\n\n<p>Several renewable energy developers&nbsp;benefit&nbsp;from the opportunities in the Maharashtra Renewable Energy and Energy Storage policy. Look at the list given below:&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Renewable Energy Industrial Zone (REIZ)\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Battery Energy Storage Systems (BESS)\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Pumped Storage Projects (PSPs)\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Wind solar hybrid projects\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Wind energy projects\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar energy projects\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Investors&nbsp;<\/strong>&nbsp;<\/p>\n\n\n\n<p>The required deployment of renewable energy generation and energy storage creates opportunities for investors. It consists of project development, storage facilities, services, and manufacturing.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Micro, Small and Medium Enterprises (MSMEs):<\/strong>&nbsp;<\/p>\n\n\n\n<p>MSMEs leverage direct accessibility to renewable energy solutions, including rooftop solar systems and distributed energy infrastructure. It promotes operational efficiency and proper infrastructure for distributed energy.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Consumers:<\/strong>&nbsp;<\/p>\n\n\n\n<p>The consumer benefits from improved access to renewable energy and better grid&nbsp;connectivity, and&nbsp;contributes to the clean energy initiative for the state of Maharashtra.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Read more &#8211; <a href=\"https:\/\/enterclimate.com\/blog\/how-are-renewable-energy-companies-and-startups-building-a-greener-india\/\">How are Renewable Energy Companies and Startups Building a Greener India?<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What are the\u00a0Features of the Maharashtra Renewable Energy and Storage Policy?\u00a0\u00a0<\/h2>\n\n\n\n<p>The key features of the Maharashtra Renewable Energy and Storage Policy are mentioned below:&nbsp;&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Battery Energy Storage Systems (BESS)\u00a0<\/h3>\n\n\n\n<p>With the increasing requirement of deploying renewable energy, the requirement for the Battery Energy Storage System (BESS) is also growing. It also manages electricity demand and grid connectivity. Here is a list of the following projects through which BESS is deployed.&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Stand-alone BESS projects\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Distributed battery storage systems\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Co-located BESS with renewable energy projects\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Utility-scale battery storage projects\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Urban solar and storage hubs\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Pumped Storage Projects (PSPs)\u00a0<\/h3>\n\n\n\n<p>PSP is an ultimate solution for the prolonged duration of energy storage to supply excess demand. It supports:&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Renewable energy integration\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Grid balancing\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Balances\u00a0High demand\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Long-term energy storage\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Energy security\u00a0<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Co-Located Renewable Energy and Storage Projects\u00a0<\/h3>\n\n\n\n<p>The Co-located&nbsp;feature&nbsp;mainly focuses&nbsp;on renewable energy projects with energy storage systems. It helps&nbsp;to improve electricity consumption and&nbsp;optimize&nbsp;renewable energy&nbsp;utilization.&nbsp;<\/p>\n\n\n\n<p>It includes:&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar with BESS\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Wind with BESS\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Wind-Solar Hybrid + BESS\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Renewable energy integrated with storage infrastructure\u00a0<\/li>\n<\/ul>\n\n\n\n<p>For&nbsp;renewable energy projects involving&nbsp;solar, wind, and wind-solar hybrid technologies, the&nbsp;MRE&nbsp;policy guides on:&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Storage capacity equivalent to at least 50% capacity of renewable energy.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A minimum\u00a0of\u00a02 hours\u00a0of storage is\u00a0required\u00a0for commissioned projects by FY2029-30, and\u00a0a minimum of\u00a04\u00a0hours of\u00a0storage time\u00a0for projects commissioned by FY2030-31.\u00a0<\/li>\n<\/ul>\n\n\n\n<p>As per the Maharashtra RE policy, the existing renewable projects can include storage&nbsp;systems&nbsp;or convert projects of&nbsp;a&nbsp;single source&nbsp;into hybrid projects.&nbsp;It is subject to applicable regulations.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Renewable Energy Industrial Zones (REIZ)\u00a0\u00a0<\/h3>\n\n\n\n<p>To deploy large-scale renewable energy projects, the state of Maharashtra is planning to&nbsp;establish&nbsp;REIZ. It aims to target the following:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>At least 10 REIZs by FY2029-30\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>At least 15 REIZs by FY2035-36\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Note:&nbsp;<\/strong>Each renewable energy project must have a minimum capacity of 100 MW.&nbsp;&nbsp;<\/p>\n\n\n\n<p>The Renewable Energy Industrial Zones (REIZ) aim to provide access to valuable land, proper infrastructure facilities, and support for&nbsp;project development. It promotes reliable renewable energy deployment in the state of Maharashtra.&nbsp;&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Green Open Access\u00a0<\/h3>\n\n\n\n<p>The Maharashtra\u2019s Renewable Energy and Storage policy promotes Green Open&nbsp;Access&nbsp;to&nbsp;eligible&nbsp;consumers. They can&nbsp;procure&nbsp;renewable energy&nbsp;directly from the energy generators rather than relying on their local distribution utility.&nbsp;It can help businesses with:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Direct access to the renewable energy\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Promotes the sustainability goals\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Power distribution of the generated energy during demand\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lower carbon emissions to support\u00a0the\u00a0policy\u2019s objectives\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Improve the energy planning in\u00a0the\u00a0long term\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Note:&nbsp;<\/strong>Green&nbsp;Open Access&nbsp;is not a mandatory requirement.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Rooftop Solar and Energy Storage\u00a0\u00a0<\/h3>\n\n\n\n<p>The Maharashtra RE policy promotes the addition of rooftop renewable connectivity for better energy storage facilities.&nbsp;The DISCOMs are supposed to&nbsp;focus on connectivity for the rooftop renewable energy projects integrated with storage systems.&nbsp;<\/p>\n\n\n\n<p>For the existing rooftop renewable energy consumers&nbsp;upgrade&nbsp;their systems with the energy storage solutions.&nbsp;This will improve reliability and maximize renewable energy&nbsp;utilization.&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Land and Infrastructure Support\u00a0<\/h2>\n\n\n\n<p>Land availability and transmission infrastructure are highly essential for securing targets of Maharashtra\u2019s&nbsp;renewable energy.&nbsp;Let\u2019s&nbsp;look&nbsp;at some of&nbsp;its&nbsp;crucial targets below:&nbsp;&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Government Land Availability\u00a0<\/h3>\n\n\n\n<p>The Maharashtra Renewable Energy and Energy Storage policy provides a structured framework. It helps to make the government land easily accessible for renewable energy and energy storage projects.&nbsp;&nbsp;<\/p>\n\n\n\n<p>In&nbsp;certain&nbsp;conditions, a&nbsp;government&nbsp;land may be leased&nbsp;at a nominal rent of Rs.1 on a yearly basis for up to 30 years. It is subject to&nbsp;applicable&nbsp;conditions and approvals.&nbsp;&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Private Land Lease Framework\u00a0\u00a0<\/h3>\n\n\n\n<p>Private\u00a0land requires an annual lease amount that must be higher than that of:\u00a0<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>6%\u00a0of the\u00a0land value\u00a0determined\u00a0by the Registration and Stamps Department,\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<p>Or&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rs. 1.25 lakh per hectare per year.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Note:&nbsp;<\/strong>The land lease amount is subject to the 3% annual escalation&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Transmission Infrastructure Development\u00a0<\/h3>\n\n\n\n<p>The MRE policy aims to take proactive measures for transitioning towards the deployment of renewable energy and energy storage&nbsp;infrastructure.&nbsp;Plus, it encourages planning&nbsp;to&nbsp;transition for REIZs and future renewable energy growth corridors.&nbsp;&nbsp;<\/p>\n\n\n\n<p>As per the State Transmission Utility (STU) and the Maharashtra State Electricity Transmission Company Limited (MSETCL),&nbsp;both&nbsp;must&nbsp;align&nbsp;with the renewable energy&nbsp;transition plan.&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why the Maharashtra Renewable Energy Policy Matters?\u00a0<\/h2>\n\n\n\n<p>The Maharashtra Renewable Energy and Energy Storage Policy&nbsp;is&nbsp;not just a roadmap but a long-term strategy. It is designed to resolve the increasing demand for electricity generation while enhancing grid connectivity and energy security.&nbsp;&nbsp;<\/p>\n\n\n\n<p>In Maharashtra, the electricity demand is expected to accelerate within a decade due to&nbsp;various&nbsp;reasons.&nbsp;It includes urbanization, high electricity generation, industrial expansion, and development. This will reduce dependency on conventional energy sources, resulting in an eco-friendly environment.&nbsp;&nbsp;<\/p>\n\n\n\n<p>The MRE Policy highlights these critical issues by continuous renewable energy generation, deploying energy storage, enhanced infrastructure development, and consumer contribution to green energy.&nbsp;&nbsp;<\/p>\n\n\n\n<p>The Maharashtra Renewable Energy Policy is important for:&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Industries seeking prolonged energy cost visibility\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Renewable energy developers plan for large projects\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Battery Energy Storage System (BESS) developers\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>DISCOMs manage future energy demand\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>MSMEs seek reliable energy storage solutions\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Investors seeking opportunities\u00a0in the\u00a0energy transition in India\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Consumers adopting renewable energy\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<p>The Maharashtra RE policy supports renewable energy projects that integrate energy storage systems. At least 100 GWh per day of energy storage capacity is required by FY2035-36 for a reliable electricity system.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Key Challenges in Implementation of Maharashtra Renewable Energy and Energy Storage Policy\u00a0\u00a0<\/h2>\n\n\n\n<p>As per Maharashtra\u2019s RE policy, several businesses&nbsp;leverage&nbsp;access to renewable energy sources. But there are a few challenges that come along with it. It includes:&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Land Acquisition is a key challenge in MRE policy to secure\u00a0suitable\u00a0land\u00a0at\u00a0a\u00a0low upfront cost.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The growing need\u00a0for\u00a0renewable\u00a0energy and energy storage projects\u00a0requires\u00a0investments in\u00a0industrial and urban infrastructure development and grid stability.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Handling\u00a0renewable\u00a0energy demand with\u00a0grid\u00a0connectivity requires advanced scheduling, forecasting, system\u00a0planning,\u00a0and storage deployment.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Regulatory coordination is a key challenge\u00a0to\u00a0maintain\u00a0with the government departments, utilities, developers, regulatory authorities, and investors.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Large-scale deployment of solar, wind, BESS, and PSP projects will require substantial capital investment.\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong><a href=\"https:\/\/enterclimate.com\/environmental-compliance-monitoring\" target=\"_blank\" rel=\"noreferrer noopener\">Environmental compliance monitoring<\/a>\u00a0<\/strong>through\u00a0experts\u00a0will help you overcome such challenges.\u00a0\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Maharashtra Government\u2019s Previous Policies for Demand Surge in Electricity\u00a0\u00a0\u00a0<\/h2>\n\n\n\n<p>Before the Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36 policy, the Maharashtra&nbsp;Government introduced various policies&nbsp;to address increasing electricity demand. The policy replaces the Maharashtra Integrated Non-Conventional Energy Generation Policy 2020.&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>Look below to know the policies:&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Green Hydrogen Policy 2023\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Pumped Storage Policy 2023\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Small Hydro Projects Policy, 2024\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Electric Vehicles Policy, 2025\u00a0\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mukhyamantri Saur Krushi Vahini Yojana (MSKVY) 2.0\u00a0<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Future Outlook\u00a0of the Maharashtra RE Policy\u00a0<\/h2>\n\n\n\n<p>The Maharashtra Renewable Energy and Energy Storage policy FY2025-26 to FY2035-36 is a&nbsp;long-term&nbsp;framework. It is designed&nbsp;for renewable energy and energy&nbsp;storage, growth,&nbsp;and deployment.&nbsp;<\/p>\n\n\n\n<p>The policy focuses on achieving 65%&nbsp;renewable energy procurement, a share of electricity demand&nbsp;in&nbsp;FY2035-36. Along with this, it supports transition by 100GW of renewable energy&nbsp;capacity and around 100GWh\/day of energy storage capacity.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Solar energy, Battery Energy Storage&nbsp;System (BESS), wind energy, Pumped Storage Projects (PSPs), Green Open Access, Renewable Energy Industrial Zones (REIZ), and transmission infrastructure modernization are contributors&nbsp;to&nbsp;achieving Maharashtra\u2019s RE policy targets.&nbsp;&nbsp;<\/p>\n\n\n\n<p>The effective implementation of policy improves energy security,&nbsp;attracts&nbsp;reliable investment,&nbsp;improves&nbsp;grid reliability, and&nbsp;promotes&nbsp;Maharashtra\u2019s transition towards&nbsp;clean energy and a sustainable energy future.&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why\u00a0Opt\u00a0for\u00a0Enterclimate\u00a0for Renewable Energy and Energy Storage Projects?\u00a0<\/h2>\n\n\n\n<p>Most businesses require consultants to smoothly&nbsp;facilitate&nbsp;the renewable energy projects, BESS, PSPs, Green OA, or renewable energy compliance to coordinate and align with the regulatory requirements.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Enterclimate\u00a0consultancy acts as a roadmap expert guide for businesses. It helps them to understand policy requirements,\u00a0identify\u00a0project approvals, assess project feasibility, and meet the compliance requirements for the Maharashtra Renewable Energy and Energy Storage Projects. Our team has\u00a0expertise\u00a0across RE project planning,\u00a0<a href=\"https:\/\/enterclimate.com\/environmental-and-social-due-diligence-in-the-renewable-energy-industry\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>environmental and social due diligence in the renewable energy industry<\/strong><\/a>,\u00a0sustainability initiatives, regulatory compliance,\u00a0<a href=\"https:\/\/enterclimate.com\/environmental-auditing\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>environmental auditing<\/strong><\/a>,\u00a0implementing energy storage and\u00a0open access\u00a0advisory.\u00a0\u00a0<\/p>\n\n\n\n<p>No matter if you are a renewable energy developer, investor, or an MSME, or a C&amp;I establishment,\u00a0<a href=\"https:\/\/enterclimate.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Enterclimate<\/strong><\/a>\u00a0assists\u00a0clearly by\u00a0determining\u00a0opportunities. This may help businesses grow with the strategy of implementing Maharashtra\u2019s RE policy.\u00a0\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Bottom Line\u00a0<\/h2>\n\n\n\n<p>Maharashtra\u2019s Renewable Energy and Energy Storage Policy FY2025-26 to FY2035-36 is&nbsp;an important step&nbsp;towards&nbsp;building a sustainable energy future.&nbsp;It&nbsp;promotes&nbsp;renewable&nbsp;energy generation, energy storage&nbsp;deployment,&nbsp;consumer participation, and transmission infrastructure development.&nbsp;<\/p>\n\n\n\n<p>The policy supports renewable energy and storage targets through BESS, PSPs, and REIZs.&nbsp;It keeps Maharashtra a&nbsp;leading state in India\u2019s clean energy requirement and creates opportunities for alike developers, investors, consumers, and businesses.&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQs on Maharashtra Renewable Energy and Energy Storage Policy FY2025-26 to FY2035-36\u00a0<\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1780733467067\"><strong class=\"schema-faq-question\"><strong>What is Maharashtra Renewable Energy and Energy Storage Policy FY2025-26 to FY2035-36?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">Maharashtra\u2019s Renewable Energy and Storage policy is a decade-long framework. It aims to promote the procurement of renewable energy generation and grid connectivity across the state of Maharashtra until FY2035-36.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733483104\"><strong class=\"schema-faq-question\"><strong>What is the main\u00a0objective\u00a0of the MRE Policy?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">The MRE policy\u2019s\u00a0objective\u00a0is to increase renewable energy\u00a0utilization, enhance consumer preferences, energy storage infrastructure, improve grid stability, and support Maharashtra\u2019s growing electricity demand.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733496136\"><strong class=\"schema-faq-question\"><strong>What renewable energy target does Maharashtra set under the policy?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">Maharashtra aims to generate 65% of its electricity demand from renewable energy sources by FY2035-36. It is encouraged by large-scale wind, solar, and hybrid renewable energy projects.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733516743\"><strong class=\"schema-faq-question\"><strong>What is Maharashtra\u2019s energy storage goal for FY2035-36?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">The Maharashtra energy and energy storage policy estimates a requirement of around 100GWh\/ day of energy storage capacity by FY2035-36. This supports integrating the renewable energy source and\u00a0maintains\u00a0grid stability.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733525040\"><strong class=\"schema-faq-question\"><strong>What is a Battery Energy Storage System (BESS)?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">A Battery Energy Storage System stores electricity to supply power during peak demand or low renewable generation. It offers storage services, improves renewable energy integration, and supports grid operations.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733539496\"><strong class=\"schema-faq-question\"><strong>What are co-located renewable energy and storage projects?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">The renewable energy and energy storage projects include the procurement of RE and Energy storage development. E.g., BESS.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733550623\"><strong class=\"schema-faq-question\"><strong>Is Green Open Access (Green OA) mandatory under the MRE policy?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">No, the Green\u00a0open access\u00a0is not mandatory, but it allows eligible consumers to\u00a0procure\u00a0renewable energy directly from generators.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733561903\"><strong class=\"schema-faq-question\"><strong>What land benefits are available for renewable energy projects?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">In specific cases, government land is leased at Rs 1 per year as nominal lease rent.\u00a0\u00a0<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780733573648\"><strong class=\"schema-faq-question\"><strong>Who can\u00a0benefit\u00a0from the Maharashtra Renewable Energy Policy?<\/strong>\u00a0<\/strong> <p class=\"schema-faq-answer\">Renewable energy developers, investors, MSMEs, DISCOMs, consumers, and industries\u00a0benefit\u00a0from the Maharashtra Renewable Energy Policy.\u00a0\u00a0<\/p> <\/div> <\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The state of Maharashtra is undergoing industrial growth and urbanization. It results in high electricity demand across the industrial, commercial, and residential sectors. Earlier, this electricity demand was fulfilled by conventional sources of energy until an official notification was released on March 18, 2026.&nbsp; The Maharashtra Government released an official notification, \u201cMaharashtra Renewable Energy and [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":2909,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[63],"tags":[150,140,151,152,93],"class_list":["post-2908","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renewable-energy","tag-environmental-and-social-due-diligence-in-the-renewable-energy-industry","tag-environmental-auditing","tag-environmental-compliance-monitoring","tag-maharashtra-renewable-energy-policy","tag-renewable-energy-sources"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Maharashtra Renewable Energy &amp; Energy Storage Policy 2025-36<\/title>\n<meta name=\"description\" content=\"Explore Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, including targets, incentives, and opportunities.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Maharashtra Renewable Energy &amp; Energy Storage Policy 2025-36\" \/>\n<meta property=\"og:description\" content=\"Explore Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, including targets, incentives, and opportunities.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/\" \/>\n<meta property=\"og:site_name\" content=\"Enterclimate\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Enterclimate\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-06T08:55:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T08:55:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Neha Gupta\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@enterclimate\" \/>\n<meta name=\"twitter:site\" content=\"@enterclimate\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Neha Gupta\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/\"},\"author\":{\"name\":\"Neha Gupta\",\"@id\":\"https:\/\/enterclimate.com\/blog\/#\/schema\/person\/43007b104b0e0782608f035f343635c3\"},\"headline\":\"Maharashtra\u2019s\u00a0Renewable Energy &amp; Energy Storage Policy\u00a02025-26\u00a0to\u00a02035-36\u00a0\",\"datePublished\":\"2026-06-06T08:55:12+00:00\",\"dateModified\":\"2026-06-06T08:55:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/\"},\"wordCount\":2850,\"publisher\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp\",\"keywords\":[\"environmental and social due diligence in the renewable energy industry\",\"Environmental Auditing\",\"Environmental compliance monitoring\",\"Maharashtra Renewable Energy Policy\",\"Renewable Energy Sources\"],\"articleSection\":[\"Renewable Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/\",\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/\",\"name\":\"Maharashtra Renewable Energy & Energy Storage Policy 2025-36\",\"isPartOf\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp\",\"datePublished\":\"2026-06-06T08:55:12+00:00\",\"dateModified\":\"2026-06-06T08:55:14+00:00\",\"description\":\"Explore Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, including targets, incentives, and opportunities.\",\"mainEntity\":[{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733467067\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733483104\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733496136\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733516743\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733525040\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733539496\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733550623\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733561903\"},{\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733573648\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage\",\"url\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp\",\"contentUrl\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp\",\"width\":1200,\"height\":630,\"caption\":\"Maharashtra Renewable Energy and Energy Storage Policy 2025-36 highlighting targets, incentives, investments, and clean energy growth\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterclimate.com\/blog\/#website\",\"url\":\"https:\/\/enterclimate.com\/blog\/\",\"name\":\"Enterclimate\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterclimate.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterclimate.com\/blog\/#organization\",\"name\":\"Enterclimate\",\"url\":\"https:\/\/enterclimate.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterclimate.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/logoclimates-1.png\",\"contentUrl\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/logoclimates-1.png\",\"width\":255,\"height\":54,\"caption\":\"Enterclimate\"},\"image\":{\"@id\":\"https:\/\/enterclimate.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Enterclimate\",\"https:\/\/x.com\/enterclimate\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterclimate.com\/blog\/#\/schema\/person\/43007b104b0e0782608f035f343635c3\",\"name\":\"Neha Gupta\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterclimate.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/fav.png\",\"contentUrl\":\"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/fav.png\",\"caption\":\"Neha Gupta\"},\"url\":\"https:\/\/enterclimate.com\/blog\/author\/neha-gupta\/\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733467067\",\"position\":1,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733467067\",\"name\":\"What is Maharashtra Renewable Energy and Energy Storage Policy FY2025-26 to FY2035-36?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Maharashtra\u2019s Renewable Energy and Storage policy is a decade-long framework. It aims to promote the procurement of renewable energy generation and grid connectivity across the state of Maharashtra until FY2035-36.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733483104\",\"position\":2,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733483104\",\"name\":\"What is the main\u00a0objective\u00a0of the MRE Policy?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The MRE policy\u2019s\u00a0objective\u00a0is to increase renewable energy\u00a0utilization, enhance consumer preferences, energy storage infrastructure, improve grid stability, and support Maharashtra\u2019s growing electricity demand.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733496136\",\"position\":3,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733496136\",\"name\":\"What renewable energy target does Maharashtra set under the policy?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Maharashtra aims to generate 65% of its electricity demand from renewable energy sources by FY2035-36. It is encouraged by large-scale wind, solar, and hybrid renewable energy projects.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733516743\",\"position\":4,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733516743\",\"name\":\"What is Maharashtra\u2019s energy storage goal for FY2035-36?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Maharashtra energy and energy storage policy estimates a requirement of around 100GWh\/ day of energy storage capacity by FY2035-36. This supports integrating the renewable energy source and\u00a0maintains\u00a0grid stability.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733525040\",\"position\":5,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733525040\",\"name\":\"What is a Battery Energy Storage System (BESS)?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A Battery Energy Storage System stores electricity to supply power during peak demand or low renewable generation. It offers storage services, improves renewable energy integration, and supports grid operations.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733539496\",\"position\":6,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733539496\",\"name\":\"What are co-located renewable energy and storage projects?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The renewable energy and energy storage projects include the procurement of RE and Energy storage development. E.g., BESS.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733550623\",\"position\":7,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733550623\",\"name\":\"Is Green Open Access (Green OA) mandatory under the MRE policy?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No, the Green\u00a0open access\u00a0is not mandatory, but it allows eligible consumers to\u00a0procure\u00a0renewable energy directly from generators.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733561903\",\"position\":8,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733561903\",\"name\":\"What land benefits are available for renewable energy projects?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In specific cases, government land is leased at Rs 1 per year as nominal lease rent.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733573648\",\"position\":9,\"url\":\"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733573648\",\"name\":\"Who can\u00a0benefit\u00a0from the Maharashtra Renewable Energy Policy?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Renewable energy developers, investors, MSMEs, DISCOMs, consumers, and industries\u00a0benefit\u00a0from the Maharashtra Renewable Energy Policy.\u00a0\u00a0\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Maharashtra Renewable Energy & Energy Storage Policy 2025-36","description":"Explore Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, including targets, incentives, and opportunities.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/","og_locale":"en_US","og_type":"article","og_title":"Maharashtra Renewable Energy & Energy Storage Policy 2025-36","og_description":"Explore Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, including targets, incentives, and opportunities.","og_url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/","og_site_name":"Enterclimate","article_publisher":"https:\/\/www.facebook.com\/Enterclimate","article_published_time":"2026-06-06T08:55:12+00:00","article_modified_time":"2026-06-06T08:55:14+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp","type":"image\/webp"}],"author":"Neha Gupta","twitter_card":"summary_large_image","twitter_creator":"@enterclimate","twitter_site":"@enterclimate","twitter_misc":{"Written by":"Neha Gupta","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#article","isPartOf":{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/"},"author":{"name":"Neha Gupta","@id":"https:\/\/enterclimate.com\/blog\/#\/schema\/person\/43007b104b0e0782608f035f343635c3"},"headline":"Maharashtra\u2019s\u00a0Renewable Energy &amp; Energy Storage Policy\u00a02025-26\u00a0to\u00a02035-36\u00a0","datePublished":"2026-06-06T08:55:12+00:00","dateModified":"2026-06-06T08:55:14+00:00","mainEntityOfPage":{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/"},"wordCount":2850,"publisher":{"@id":"https:\/\/enterclimate.com\/blog\/#organization"},"image":{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage"},"thumbnailUrl":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp","keywords":["environmental and social due diligence in the renewable energy industry","Environmental Auditing","Environmental compliance monitoring","Maharashtra Renewable Energy Policy","Renewable Energy Sources"],"articleSection":["Renewable Energy"],"inLanguage":"en-US"},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/","url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/","name":"Maharashtra Renewable Energy & Energy Storage Policy 2025-36","isPartOf":{"@id":"https:\/\/enterclimate.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage"},"image":{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage"},"thumbnailUrl":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp","datePublished":"2026-06-06T08:55:12+00:00","dateModified":"2026-06-06T08:55:14+00:00","description":"Explore Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, including targets, incentives, and opportunities.","mainEntity":[{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733467067"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733483104"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733496136"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733516743"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733525040"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733539496"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733550623"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733561903"},{"@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733573648"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#primaryimage","url":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp","contentUrl":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2026\/06\/Maharashtras-Renewable-Energy-Energy-Storage-Policy-2025-26-to-2035-36-.webp","width":1200,"height":630,"caption":"Maharashtra Renewable Energy and Energy Storage Policy 2025-36 highlighting targets, incentives, investments, and clean energy growth"},{"@type":"WebSite","@id":"https:\/\/enterclimate.com\/blog\/#website","url":"https:\/\/enterclimate.com\/blog\/","name":"Enterclimate","description":"","publisher":{"@id":"https:\/\/enterclimate.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterclimate.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterclimate.com\/blog\/#organization","name":"Enterclimate","url":"https:\/\/enterclimate.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterclimate.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/logoclimates-1.png","contentUrl":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/logoclimates-1.png","width":255,"height":54,"caption":"Enterclimate"},"image":{"@id":"https:\/\/enterclimate.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Enterclimate","https:\/\/x.com\/enterclimate"]},{"@type":"Person","@id":"https:\/\/enterclimate.com\/blog\/#\/schema\/person\/43007b104b0e0782608f035f343635c3","name":"Neha Gupta","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterclimate.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/fav.png","contentUrl":"https:\/\/enterclimate.com\/blog\/wp-content\/uploads\/2022\/07\/fav.png","caption":"Neha Gupta"},"url":"https:\/\/enterclimate.com\/blog\/author\/neha-gupta\/"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733467067","position":1,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733467067","name":"What is Maharashtra Renewable Energy and Energy Storage Policy FY2025-26 to FY2035-36?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Maharashtra\u2019s Renewable Energy and Storage policy is a decade-long framework. It aims to promote the procurement of renewable energy generation and grid connectivity across the state of Maharashtra until FY2035-36.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733483104","position":2,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733483104","name":"What is the main\u00a0objective\u00a0of the MRE Policy?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The MRE policy\u2019s\u00a0objective\u00a0is to increase renewable energy\u00a0utilization, enhance consumer preferences, energy storage infrastructure, improve grid stability, and support Maharashtra\u2019s growing electricity demand.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733496136","position":3,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733496136","name":"What renewable energy target does Maharashtra set under the policy?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Maharashtra aims to generate 65% of its electricity demand from renewable energy sources by FY2035-36. It is encouraged by large-scale wind, solar, and hybrid renewable energy projects.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733516743","position":4,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733516743","name":"What is Maharashtra\u2019s energy storage goal for FY2035-36?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The Maharashtra energy and energy storage policy estimates a requirement of around 100GWh\/ day of energy storage capacity by FY2035-36. This supports integrating the renewable energy source and\u00a0maintains\u00a0grid stability.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733525040","position":5,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733525040","name":"What is a Battery Energy Storage System (BESS)?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"A Battery Energy Storage System stores electricity to supply power during peak demand or low renewable generation. It offers storage services, improves renewable energy integration, and supports grid operations.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733539496","position":6,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733539496","name":"What are co-located renewable energy and storage projects?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The renewable energy and energy storage projects include the procurement of RE and Energy storage development. E.g., BESS.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733550623","position":7,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733550623","name":"Is Green Open Access (Green OA) mandatory under the MRE policy?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"No, the Green\u00a0open access\u00a0is not mandatory, but it allows eligible consumers to\u00a0procure\u00a0renewable energy directly from generators.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733561903","position":8,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733561903","name":"What land benefits are available for renewable energy projects?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"In specific cases, government land is leased at Rs 1 per year as nominal lease rent.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733573648","position":9,"url":"https:\/\/enterclimate.com\/blog\/maharashtra-renewable-energy-policy-2025-26-to-2035-36\/#faq-question-1780733573648","name":"Who can\u00a0benefit\u00a0from the Maharashtra Renewable Energy Policy?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Renewable energy developers, investors, MSMEs, DISCOMs, consumers, and industries\u00a0benefit\u00a0from the Maharashtra Renewable Energy Policy.\u00a0\u00a0","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/posts\/2908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/comments?post=2908"}],"version-history":[{"count":1,"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/posts\/2908\/revisions"}],"predecessor-version":[{"id":2910,"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/posts\/2908\/revisions\/2910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/media\/2909"}],"wp:attachment":[{"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/media?parent=2908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/categories?post=2908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterclimate.com\/blog\/wp-json\/wp\/v2\/tags?post=2908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}